Cycle time
Cycle time is how long a machine takes to make one part, from program start until the part is done and the next can begin.
Cycle time is the interval between the start and the end of producing one part on a machine or station. In machining it usually runs from cycle start to program end, including cuts, tool changes and rapid moves. It is the basis for machine-hour quoting and for plant capacity.
How it works
A cycle has cutting time (the tool removing material) and non-cutting time (tool changes, approaches, part changes). Cutting time depends on speed, feed and depth of cut; non-cutting time depends on the program and the fixturing. To compare, separate the ideal cycle (the best stable cycle) from the measured actual cycle; the gap feeds the performance factor of OEE.
Practical example
A flange takes 4 min 10 s with the original program. Combining two operations on the same tool and trimming rapid approaches brings the cycle to 3 min 25 s. On a batch of 600 parts, that frees 7.5 machine hours for another order.
Common mistakes
- Quoting with the CAM simulator time without adding part loading and inspection.
- Not tracking the actual cycle and finding out at month end that the part loses money.
- Confusing cycle time with takt time, which is the pace the customer demands.
FAQ
What is the difference between cycle time and takt time?
Cycle time is how long the process takes; takt time is how often the customer needs a part. If the cycle is longer than the takt, demand is not met.