Skip to content
DOWNWAY

Manufacturing documentation

A documentation package purchasing, the shop floor and suppliers can all use

We turn models and loose drawings into a release-ready manufacturing package: one drawing per part, assembly drawings, a structured bill of materials, STEP and DXF exports, and a revision table that matches the files. It is for companies that build from documentation sent to suppliers, or that lose time every time a part is re-quoted.

What we deliver

DeliverableFiles and formats
Detail drawingsPDF + native · one part per drawing, revision in the title block
Assembly drawingsPDF · balloons tied to BOM item numbers, exploded views when useful
Bill of materialsXLSX / CSV · multi-level, make/buy, material, finish, quantity per assembly
Manufacturing exportsSTEP per part · DXF flat patterns · PDF set in one file
Release recordRevision table, change notes and a file index per release

Drawings in mm, inches or dual-dimensioned (mm / in), to the standard on your title block.

How it works

  1. 1

    Inventory what exists

    Models, drawings, spreadsheets and the BOM your purchasing team uses today.

  2. 2

    Agree the structure

    Part numbering, drawing template, BOM columns and what counts as a release.

  3. 3

    Build the package

    Missing drawings created, existing ones corrected, exports generated from the same revision.

  4. 4

    Release and hand over

    A file index and a folder structure your team can keep up to date.

Who it's for

  • Manufacturers that send RFQs to several suppliers and get inconsistent quotes back
  • Companies whose product knowledge lives in one engineer's head or one CAD seat
  • Teams preparing to outsource production or move it to a new plant

Who it's not for

  • Regulated documentation that must be produced inside your QMS by your own staff (medical device DHF, aerospace FAI packages)
  • One-off drawings; for those see CAD engineering

Why documentation packages break

Most packages fail in the same places: a BOM edited in a spreadsheet that no longer matches the assembly, a DXF exported from an older revision, a drawing with a revision letter that nobody updated. Each mismatch costs a phone call from a supplier or, worse, a batch of parts made to the wrong revision.

We build the package so that every export comes from the same model revision, and the revision table on the drawing is the single place that says what changed.

What we check before release

Check Why it matters
BOM quantities vs. assembly Purchasing orders what the BOM says, not what the model shows
Drawing revision vs. model revision Suppliers build from the PDF, not from your CAD
DXF scale, units and bend lines A DXF at the wrong scale is cut anyway
Material and finish callouts Missing finish is the most common reason for re-quotes
Part numbers unique and consistent Duplicates break ERP imports

FAQ

What does a complete package contain?

At minimum: a drawing for every made part, assembly drawings, a BOM that matches the assembly drawings, STEP files per part, DXF for sheet-metal and profile-cut parts, and a revision record. We agree the exact list in the scope.

Can you fix our existing BOM?

Yes. We reconcile the spreadsheet against the CAD assemblies, flag quantities and part numbers that disagree, and deliver a corrected BOM with the changes listed.

Do you work inside our PDM?

If you can give us a seat or a check-out workflow, yes. Otherwise we work on exported files and return them with a clear folder and naming structure for you to check in.

Which standard do the drawings follow?

The one your customers and suppliers expect: ASME Y14.5 for most North American work, ISO 128 and ISO 2768 for most European work.

Related

Send us one assembly

Send a small assembly with whatever drawings and BOM you have. We return a gap list and a fixed-price scope for the full package.

Send a drawing