A first article inspection (FAI) verifies that the first part made by a new process, supplier or revision meets every requirement on the drawing before the batch runs. The report includes a ballooned drawing with every characteristic numbered, the measured value and result for each, material and special process certificates, and a sign-off that releases production.

Guilherme Rodrigues ItinoseUpdated 2 min read

Key takeaways

  • FAI happens on the first part of a new part, supplier, process or revision.
  • Balloon every dimension, note and spec on the drawing and measure all of them.
  • Record measured values, not just pass/fail.
  • Attach material certificates and special process records.
  • A partial FAI is enough when only some features changed.

The cheapest moment to find a problem is the first part. A first article inspection (FAI) makes sure the process, not just one lucky part, meets the drawing before hundreds of pieces are made.

When to do an FAI

  • First production of a new part.
  • New supplier or new machine, fixture or program.
  • New drawing revision (full or partial FAI depending on what changed).
  • Process stopped for a long period.

What goes in the report

Section Content
Ballooned drawing Every dimension, note and specification numbered
Characteristic accountability Requirement, measured value, method, result
Materials Material certificate traceable to the part
Special processes Heat treatment, plating, painting records
Approval Who reviewed, date, decision

Practical tips

  • Balloon the drawing before machining starts, so the shop knows what will be checked.
  • Record real values. “OK” hides how close a feature was to the limit.
  • Use the right instrument for each tolerance and note it in the report.
  • Keep the FAI tied to the drawing revision; a new revision triggers a review.

Clear, complete drawings make FAI faster. Our manufacturing documentation service prepares ballooned drawings and inspection-ready drawing sets.

When to outsource this

  • You are qualifying a new machining or fabrication supplier
  • Your customer requires FAI reports, for example in aerospace or automotive

When not to

  • Simple purchased catalog parts with supplier certificates

FAQ

Is there a standard for FAI?

Aerospace uses AS9102. Automotive uses the PPAP process. Many other industries use a simplified version of the same idea.

Do I need a CMM for FAI?

Not always. Use the measuring method the tolerance requires: calipers and gauges for general tolerances, CMM for complex geometry and tight GD&T.

What if one characteristic fails?

Record it, decide disposition with engineering, correct the process and re-inspect the affected characteristics before releasing the batch.

How long should I keep FAI records?

Keep them as long as the part is supplied and as required by your quality system or customer contract.

Send us one drawing

We return a review with issues found, suggested fixes and a fixed-price scope.

Real project experience

Websites we have launched

A few businesses that trusted Downway to build their digital presence.